- Lumber Package is treated doug fir by Honsador Lumber dipped in Honolulu for the best treatment available for lumber in Hawaii.
- 4 PLYGEM WINDOWS(2 SH,2 XO Sliders)
- 36" Door with glass.Front platform is additionally treated with wood preservative then painted.
- 3'x2' 2 Vented Cupola with Hip Roof.
- Hip Roof with 2x6 Bodyguard fascia primed then painted. An additional 1x3 Primed Bodyguard trim is added for a roof drip-edge support.
- LP SmartPanel 20 Year Siding
- Kelleher BodyGuard 30 Year fascia, wall, window trims.
- 30 year Architect 90 singles installed by- "Roofing By Dale" with wall, step flashing on cupola walls.
- 2x12 Floor joists doubled on 4 sides.3/4' T&G fastened utilizing glue. Simpson joist hangers on each member.
- 4x4 post into a foundation block with straps block to joist through post for a continuous hold down into foundation.
- 2x4 wall standard wall construction with 4x12 window and door headers.
- 9' x 4' T1-11 LP SMART SIDE SIDING fastened with galvanized ring shank nail nail 6" O.C. on edges and 12" in the field.
- 2x6 Rafters conventionally framed with 2x6 vented bird blocks from Maui Truss. Rafters are then hurricane clipped to the wall.
- Painting and caulking is then provided by RZ Painting on all exterior surfaces including cupola, walls, eaves, bird blocks, rafter ends.
- Bottom edges of the joists are additionally treated with wood preservative and primer on all outer edges and tops of the joists prior to 3/4" decking installation.
- This is done to provide additional protection against rot and termite entry.